project duration
美
英 
- 網(wǎng)絡(luò)工期;項(xiàng)目工期項(xiàng)目持續(xù)時間;項(xiàng)目實(shí)施時間
例句
Furthermore, the project duration is usually specified and the contractor must abide by the deadline for completion.
此外,項(xiàng)目工期通常是明確規(guī)定的,承包商必須按期限完成工程。
these latter two types of links automatically overlap tasks , which tends to decrease the overall project duration.
后兩種鏈接類型自動地重疊任務(wù),這將趨于縮短項(xiàng)目的總工期。
A technique used to predict project duration by analyzing which sequence of activities has the least amount of scheduling flexibility.
一種用來預(yù)測項(xiàng)目工期的方法,通過分析序列活動使時間安排更具靈活性,項(xiàng)目工期更少。
This allows you to design large project structures with different phases spread over the project duration cycle.
這允許你把一個長期的大項(xiàng)目分成多個階段去完成。
The increase in project duration normally translates into an increase in the cost of labour as the labour is deployed on daily wages basis.
增加的項(xiàng)目期限通常轉(zhuǎn)化為增加勞工成本,勞工若部署在日工資的基礎(chǔ)上。
Cost itself may be a product of other factors, including the project duration, resources, and environment.
費(fèi)用本身也可能是產(chǎn)品的其它要素,包括產(chǎn)品工期,資源環(huán)境等。
The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.
項(xiàng)目快速跟進(jìn)的目標(biāo)是:提高生產(chǎn)效率減少項(xiàng)目歷時提高進(jìn)度跟蹤控制降低項(xiàng)目風(fēng)險。
This dissertation aims to increase the understanding on the interactive effects of software project duration, risk factors and performance.
本篇論文的主要目標(biāo)在探討軟體專案時程、風(fēng)險因子與績效間的相互關(guān)系。
The optimal size of resource is, therefore, defined as the minimum size of resource required to keep the project duration a minimum.
最佳大小的資源,所以被界定為最小尺寸的資源必須保持項(xiàng)目持續(xù)時間減少到最低限度。
The converged project duration together the crew size used is shown in Table 3.
融合項(xiàng)目期限連同船員尺寸是采用表3所示。
Total project duration is expected to be completed at the end of 2014.
項(xiàng)目總工期預(yù)計(jì)于2014年底全部竣工。
However, an increase in the size of the plumbing crew reduced the project duration to 229 days.
不過,增加的大小管道船員減少了項(xiàng)目執(zhí)行期已達(dá)229天。
The project duration increased with the reduction in the size of resources.
該項(xiàng)目執(zhí)行期的增加而減少的規(guī)模資源。
Define tasks that are short compared with the overall project duration.
定義整個項(xiàng)目工期中的短任務(wù)。
Apply three proven approaches to reduce project duration.
采用三種行之有效的方法縮減項(xiàng)目工期。
In exceptional circumstances the commision may allow the project duration to exceed 6 months.
如果情況特殊,委員會可以允許工程超過六個月。
Chapter 5, study the correlation deeply between project duration and cost(time-cost trade-off).
第五章,對項(xiàng)目施工工期和費(fèi)用之間的相關(guān)性進(jìn)行深入研究;
Project estimates a single project duration based on a weighted average of the three duration values for each task.
Project基于每個任務(wù)的三個工期值的加權(quán)平均值估計(jì)單個項(xiàng)目工期。
The project duration is initially 30 days but will be extended.
該項(xiàng)目為期30天,但最初將延長。
A Revenue Incentive Model of Project Duration Coordination between Project Corporation and Contractor
基于工期協(xié)調(diào)的項(xiàng)目公司與承包商收益激勵模型
The Risk Management Decision Model of the Model Project Duration and Adaptive Genetic Algorithm
型號項(xiàng)目工期風(fēng)險管理決策模型與自適應(yīng)遺傳算法
Reducing project duration by redefining logical relationships
重新界定邏輯關(guān)系,以縮短項(xiàng)目周期
Incentive Optimization and the Determination of Optimal Project Duration to Multi-contracts
多合同的激勵優(yōu)化與最優(yōu)工期確定
The Optimization of Income Incentive and the Determination of Optimal Project Duration
收益激勵的優(yōu)化與最優(yōu)工期的選擇
Analysis on the Relation between Risk Factors and Project Duration
風(fēng)險因素與項(xiàng)目總工期的相關(guān)性研究
Research on engineering project duration risk based on fuzzy network
基于模糊網(wǎng)絡(luò)的工程項(xiàng)目工期風(fēng)險評估研究