国产高清精品免费区-男女一进一出抽搐免费视频-中日韩一二三级黄色永久视频-日韩精品人妻一区二区免费视频-日本久久视频在线观看-99热这里只有精品88热-亚洲韩国黄色最新短视频一区-日韩伦理在线观看免费全集-国产av一区二区三区天堂

project duration

project duration

 英

  • 網(wǎng)絡(luò)工期;項(xiàng)目工期項(xiàng)目持續(xù)時間;項(xiàng)目實(shí)施時間

例句

Furthermore, the project duration is usually specified and the contractor must abide by the deadline for completion.

此外項(xiàng)目工期通常明確規(guī)定承包商必須期限完成工程

these latter two types of links automatically overlap tasks , which tends to decrease the overall project duration.

鏈接類型自動重疊任務(wù)趨于縮短項(xiàng)目工期

A technique used to predict project duration by analyzing which sequence of activities has the least amount of scheduling flexibility.

一種用來預(yù)測項(xiàng)目工期方法通過分析序列活動使時間安排具靈活性項(xiàng)目工期

This allows you to design large project structures with different phases spread over the project duration cycle.

允許一個長期項(xiàng)目分成多個階段完成

The increase in project duration normally translates into an increase in the cost of labour as the labour is deployed on daily wages basis.

增加項(xiàng)目期限通常轉(zhuǎn)化增加勞工成本勞工部署工資基礎(chǔ)

Cost itself may be a product of other factors, including the project duration, resources, and environment.

費(fèi)用本身可能產(chǎn)品其它要素包括產(chǎn)品工期資源環(huán)境

The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.

項(xiàng)目快速跟進(jìn)目標(biāo)提高生產(chǎn)效率減少項(xiàng)目歷時提高進(jìn)度跟蹤控制降低項(xiàng)目風(fēng)險

This dissertation aims to increase the understanding on the interactive effects of software project duration, risk factors and performance.

篇論文主要目標(biāo)探討軟體專案風(fēng)險因子績效相互關(guān)系

The optimal size of resource is, therefore, defined as the minimum size of resource required to keep the project duration a minimum.

最佳大小資源所以界定最小尺寸資源必須保持項(xiàng)目持續(xù)時間減少最低限度

The converged project duration together the crew size used is shown in Table 3.

融合項(xiàng)目期限連同船員尺寸采用3

Total project duration is expected to be completed at the end of 2014.

項(xiàng)目工期預(yù)計(jì)2014年全部竣工

However, an increase in the size of the plumbing crew reduced the project duration to 229 days.

不過增加大小管道船員減少項(xiàng)目執(zhí)行達(dá)229

The project duration increased with the reduction in the size of resources.

項(xiàng)目執(zhí)行增加減少規(guī)模資源

Define tasks that are short compared with the overall project duration.

定義整個項(xiàng)目工期任務(wù)

Apply three proven approaches to reduce project duration.

采用行之有效方法縮減項(xiàng)目工期

In exceptional circumstances the commision may allow the project duration to exceed 6 months.

如果情況特殊委員會可以允許工程超過六個

Chapter 5, study the correlation deeply between project duration and cost(time-cost trade-off).

第五項(xiàng)目施工工期費(fèi)用之間相關(guān)性進(jìn)行深入研究

Project estimates a single project duration based on a weighted average of the three duration values for each task.

Project基于每個任務(wù)三個工期加權(quán)平均估計(jì)單個項(xiàng)目工期

The project duration is initially 30 days but will be extended.

項(xiàng)目為期30最初延長

A Revenue Incentive Model of Project Duration Coordination between Project Corporation and Contractor

基于工期協(xié)調(diào)項(xiàng)目公司承包商收益激勵模型

The Risk Management Decision Model of the Model Project Duration and Adaptive Genetic Algorithm

型號項(xiàng)目工期風(fēng)險管理決策模型適應(yīng)遺傳算法

Reducing project duration by redefining logical relationships

重新界定邏輯關(guān)系縮短項(xiàng)目周期

Incentive Optimization and the Determination of Optimal Project Duration to Multi-contracts

合同激勵優(yōu)化最優(yōu)工期確定

The Optimization of Income Incentive and the Determination of Optimal Project Duration

收益激勵優(yōu)化最優(yōu)工期選擇

Analysis on the Relation between Risk Factors and Project Duration

風(fēng)險因素項(xiàng)目工期相關(guān)性研究

Research on engineering project duration risk based on fuzzy network

基于模糊網(wǎng)絡(luò)工程項(xiàng)目工期風(fēng)險評估研究

熱門查詢